Cortez Construction

Concrete Construction and Rehabilitation Services

Cortez Construction Ltd. constructs buildings, bridges, reservoirs, dams, retaining walls and all other manner of unique and challenging rehabilitation projects anywhere throughout BC and Alberta.

Building Construction

Cortez takes projects from concept to completion. Whether it is the Riverside Coliseum in Kamloops — where we formed 6,500 cubic meters of concrete into structural support and cast seating — or the R.C.M.P. office and lock-up in Nakusp, we take architectural drawings to final completion on budget.

We believe in integrity and honesty. Our professionals construct buildings to work without structural or functional problems. Cortez’ scope of work has included a wide variety of construction. We value the smaller commercial buildings equally with the multi-million dollar projects.

Cortez’ quality buildings are constructed to work well and to last.

Heavy Concrete Construction — Bridges, Rehabilitation Projects

We are specialists in heavy concrete construction, bridging highways and logging roads, and building innovative projects such as sewer lift systems and ferry ramps.

Cortez Construction Ltd. has built new bridges or reconstructed aging ones across some of the most challenging terrain in British Columbia. At Savona, our bridge is 334 meters long and its columns and girders are up to 30 meters high.

Our innovative technology is demonstrated by techniques like saw-cutting the old concrete and lifting off the 56 meter Kitseguecla Bridge deck near Hazelton before resurfacing, and by the use of hydraulic water pressure to strip the B.C. Lotto parkade before reconstruction.

Construction Photos

Dore Bridge — Pour Day

Dore Bridge
— Pour Day

Dore Bridge — Ready for Concrete

Dore Bridge
— Ready for Concrete

Kiskatinaw Bridge — Setting Screed Machine Rails

Kiskatinaw Bridge
— Setting Screed Machine Rails

Murray Bridge — Finger Joint Installation

Murray Bridge
— Finger Joint Installation

Walhachin Bridge — Timber Decking Replacement

Walhachin Bridge
— Timber Decking Replacement

Walhachin Bridge — Timber Decking Replacement

Walhachin Bridge
— Timber Decking Replacement

Old Kiskatinaw Bridge — Guardrail Support Replacement

Old Kiskatinaw Bridge
— Guardrail Support Replacement

Line Creek Crew

Line Creek
— Crew

Cheekye Bridge — Deck Joint Prep

Cheekye Bridge
— Deck Joint Prep

Juliette Overpass — Pier Repairs

Juliette Overpass
— Pier Repairs

Line Creek #3 — Wall Repairs

Line Creek #3
— Wall Repairs

Lower Liard Bridge — Finger Joint Rehab

Lower Liard Bridge
— Finger Joint Rehab

Trout River Bridge — Approach Slab Rehab

Trout River Bridge
— Approach Slab Rehab

Trout River Bridge — Approach Slab Rehab 2

Trout River Bridge
— Approach Slab Rehab 2

Trout River Bridge — Finishing

Trout River Bridge
— Finishing

2011 — Overlander Bridge — Sidewalk Repairs

Overlander Bridge
— Sidewalk Repairs

2011 — Line Creek Bridge #6 — Wall Repairs 2

Line Creek Bridge #6
— Wall Repairs

2011 — Line Creek Bridge #6 — Wall Repairs

Line Creek Bridge #6
— Wall Repairs

2011 — Line Creek Bridge #2 — Mid-pour

Line Creek Bridge #2
— Mid-pour

2011 — Cranberry River Bridge #1 — Mid-pour

Cranberry River Bridge #1
— Mid-pour

2011 — Cranberry River Bridge #1 — End of Pour

Cranberry River Bridge #1
— End of Pour

2011 — Coldwater Underpass — Girder Repairs

Coldwater Underpass
— Girder Repairs

2011 — Coldwater Underpass — Column Repairs

Coldwater Underpass
— Column Repairs

2010 — Yale Bridge — Sidewalk Resurfacing

Yale Bridge
— Sidewalk Resurfacing

2010 — Yale Bridge — Sidewalk Finishing

Yale Bridge
— Sidewalk Finishing

2010 — Walloper Underpass — Pre-pour Hydrowashing

Walloper Underpass
— Pre-pour Hydrowashing

2010 — Walloper Underpass — Pre-bridge Jacking

Walloper Underpass
— Pre-bridge Jacking

2010 — Walloper Underpass — Jackhammering

Walloper Underpass
— Jackhammering

2010 — Sikanni Chief River Bridge — Pier Cap Repairs

Sikanni Chief River Bridge
— Pier Cap Repairs

2010 — Mohun River Bridge — Finished Product

Mohun River Bridge
— Finished Product

2010 — MacDonald Creek Bridge — Approach Barrier Work

MacDonald Creek Bridge
— Approach Barrier Work

2010 — 21st Street Overpass — Pre-pour Inspection

21st Street Overpass
— Pre-pour Inspection

2010 — 21st Street Overpass — Pre-pour Hydrowashing

21st Street Overpass
— Pre-pour Hydrowashing

2010 — 21st Street Overpass — Deck Joint Welding

21st Street Overpass
— Deck Joint Welding

2009 — Yahk Slough Bridge — Pre-pour

Yahk Slough Bridge
— Pre-pour

2009 — Lukwa River Bridge — End of Pour

Lukwa River Bridge
— End of Pour

2008 — Leanchoil Overpass — Deck Joint Forming

Leanchoil Overpass
— Deck Joint Forming

2007 — Mount Nelson Reservoir — Pre-wall Pour

Mount Nelson Reservoir
— Pre-wall Pour

2007 — Mount Nelson Reservoir — Finished Product

Mount Nelson Reservoir
— Finished Product

Page Mine Web Design